
Steel Fabrication
Mild steel and stainless assemblies, from single items to batch production.

MIG, TIG and spot welding across mild steel, stainless steel and aluminium: structural joints, stainless welds and cosmetic work where the weld is part of the finished appearance.
Applications
What we need
Missing something from this list? Send what you have. Most enquiries can be priced from a dimensioned sketch, and we would rather ask one question than quote round a gap.
Welding is the process most often specified badly on a drawing and most often blamed afterwards. This is how the three are actually chosen.
GMAW
Structural and higher-deposition work. Frames, platforms, chassis and support steelwork where deposition rate and penetration matter more than appearance.
GTAW
Where the weld is visible, where the material is thin, and for stainless and aluminium where heat input and contamination control decide the outcome.
Resistance
Sheet assemblies and panel work where a fusion weld would distort the panel and no amount of dressing would recover it.

Distortion is managed by sequence and jigging, not by straightening afterwards.
On assemblies that have to fit existing structure, we trial-assemble in the works before anything is loaded onto a lorry.
No. We do not hold welder coding or approved welding procedures, and we do not undertake work that requires them. If your specification calls for welders qualified to BS EN ISO 9606, procedures qualified to ISO 15614, or third-party inspection against a coded procedure, you need a coded shop, and we will tell you that at enquiry rather than at delivery.
MIG where deposition rate and penetration matter more than appearance: frames, platforms, chassis and support steelwork. TIG where the weld is visible, where the material is thin, and for stainless and aluminium, where heat input and contamination control decide the outcome. Most real assemblies use both, chosen joint by joint rather than for the whole job.
Yes. TIG on both, with resistance spot welding available on sheet assemblies where a fusion weld would distort the panel. On stainless the specification usually needs to state the finish as well as the joint, because a weld that is structurally perfect can still be rejected on appearance.
By sequence and by jigging rather than by straightening afterwards. Weld sequencing, staggered and back-step technique, and fixturing where the assembly justifies it. Straightening after the fact is slower, less reliable, and on a visible fabrication it usually shows. On assemblies that have to fit existing structure we trial-assemble before despatch.
Yes, in the works or on site. Repair welding, reinforcement and modification of installed metalwork are ordinary work here. See site and project support. Photographs of the existing item, and of how it failed, are the most useful thing you can send.
Not in-house. Independent testing (dye penetrant, magnetic particle, ultrasonic or radiographic) can be arranged through established supply-chain partners where a specification calls for it. Say so at enquiry so it is priced into the job rather than discovered halfway through it.
Related capability
Most jobs cross two or three disciplines. Quoting them together removes handling, transport and the interface risk that comes with splitting a job across suppliers.

Mild steel and stainless assemblies, from single items to batch production.

Design-and-build for one-off problems that have no catalogue answer.

Turning and milling, CNC and manual, as a standalone or in-process service.
DXF, DWG, PDF, STEP and IGES accepted. Files are stored securely outside the public web root and are never shared outside the group.